Before & After

(Click images to switch.)

Patio Process

(Click steps to switch.)

  1. Dig
  2. Pack
  3. Fabric
  4. Base & Tamp
  5. Throw & Screed
  6. Sand
  7. Brick
  8. Cuts
  9. Polymeric
  10. Set

1. Dig

The extraction process.

The area extracted is always deep enough to hold the minimum required base (6"), brick and sand(1"). This is usually a depth of about 13" below the final grade of the patio. We do our measuring with laser levels, so we can be sure our measurements.

Highlight Reel

(Click an image to switch.)